3 Way Corner Stanchions allow Quick Dam Flood Gates to be connected together at a corner.
*The stanchion base needs to be installed by digging a 10 inch hole and filling with concrete, with the top of the base level with the surface.
*The stanchion base needs to be installed by digging a 10 inch hole and filling with concrete, with the top of the base level with the surface.
Solar theme designed by epicShops